Skip to content

Viseu district

Solar panels in Nelas: what they produce

According to PVGIS, each kWp of panels facing south produces 1,494 kWh a year in Nelas, 1% below the median of Portugal's 308 municipalities (1,514 kWh). A 4 kWp system produces about 5,980 kWh a year here.

Nelas in numbers

  1. kWh per kWp a year, facing south

    At 35° tilt with 14% losses, from SARAH2 satellite data for 2005 to 2020 (PVGIS).

  2. of Portugal's 308 municipalities

    In Viseu district, it ranks 10th of 24.

  3. kWh per kWp in July, the best month

    In November, the worst, 1 kWp produces 89 kWh, 54% of the best month. An off grid system has to be sized for that month.

  4. less on a roof facing east

    West, 21% less; south east, 6% less; south west, 6% less.

Production of 1 kWp each month
91Jan103Feb124Mar128Apr144May142Jun163Jul160Aug142Sep116Oct89Nov91Dec

A 4 kWp system in Nelas

Yearly production
5,980 kWh
Used at home (30%, the typical share)
€440 a year
Sold as surplus
€210 a year
Indicative price, turnkey, with VAT
€5,500 to €7,500
Payback
9 to 12 years

What you use saves about €0.24 per kWh; the surplus sells at about €0.05.

Run the numbers with your own bill

Rules and the grid

Systems above 700 W and up to 30 kW need a prior notice on the DGEG portal, made by the installing technician before installation. In most of mainland Portugal the distribution grid belongs to E‑REDES, which assigns the production CPE.

Read the DGEG registration guide

On the map

Nelas, highlighted, in Viseu district.
Every municipality in Viseu district

Neighbouring municipalities

MunicipalityDistance between seatskWh per kWp
Mangualde12 km1,494
Carregal do Sal16 km1,496
Seia16 km1,384
Viseu17 km1,508
Oliveira do Hospital17 km1,465
Tondela20 km1,514

Sources

Ask for quotes you can compare.

Twelve quick choices, then your contact details. Free for you.

Free, no obligation. Your details only go to installers with your permission, at the end of the form.