Solar panels in Arouca: what they produce

According to PVGIS, each kWp of panels facing south produces 1,411 kWh a year in Arouca, 7% below the median of Portugal's 308 municipalities (1,514 kWh). A 4 kWp system produces about 5,640 kWh a year here.

Arouca in numbers

  1. kWh per kWp a year, facing south

    At 35° tilt with 14% losses, from SARAH2 satellite data for 2005 to 2020 (PVGIS).

  2. of Portugal's 308 municipalities

    In Aveiro district, it ranks 17th of 19.

  3. kWh per kWp in July, the best month

    In December, the worst, 1 kWp produces 77 kWh, 48% of the best month. An off grid system has to be sized for that month.

  4. less on a roof facing east

    West, 19% less; south east, 7% less; south west, 5% less.

Production of 1 kWp each month
78Jan95Feb117Mar119Apr139May140Jun160Jul160Aug139Sep107Oct78Nov77Dec

A 4 kWp system in Arouca

Yearly production
5,640 kWh
Used at home (30%, the typical share)
€410 a year
Sold as surplus
€200 a year
Indicative price, turnkey, with VAT
€5,500 to €7,500
Payback
9 to 12 years

What you use saves about €0.24 per kWh; the surplus sells at about €0.05.

Run the numbers with your own bill

Rules and the grid

Systems above 700 W and up to 30 kW need a prior notice on the DGEG portal, made by the installing technician before installation. In most of mainland Portugal the distribution grid belongs to E‑REDES, which assigns the production CPE.

Read the DGEG registration guide

On the map

Arouca, highlighted, in Aveiro district.
Every municipality in Aveiro district

Neighbouring municipalities

MunicipalityDistance between seatskWh per kWp
Castelo de Paiva12 km1,402
Vale de Cambra15 km1,419
São João da Madeira21 km1,441
Cinfães21 km1,390
Oliveira de Azeméis22 km1,429
Oliveira de Frades22 km1,438

Sources

Ask for quotes you can compare.

Twelve quick choices, then your contact details. Free for you.

Free, no obligation. Your details only go to installers with your permission, at the end of the form.